Drought Raises Pollution On Folsom Dam Spillway Project This Year

Low water levels at Folsom Lake are causing an increase in air pollution from the $900 million Folsom Dam auxiliary spillway project.

The lake is filled to just 40 percent of capacity, which has allowed construction to proceed without the use of marine excavation equipment this year. The land equipment used instead has emitted more nitrogen oxide, said Katie Huff, spokesman for the U.S. Army Corps of Engineers. The corps is working with the U.S. Department of the Interior and the Bureau of Reclamation on the project.

Nitrogen oxide is formed by fuel combustion of automobiles, trucks and non-road vehicles like construction equipment.

Studies have linked short-term nitrogen oxide exposure, ranging from 30 minutes to 24 hours, with adverse respiratory effects, including airway inflammation in healthy people and increased respiratory symptoms in people with asthma.

Increased construction this year will cause the project to exceed federal threshold guidelines for nitrogen oxide emissions.

The annual federal threshold for such emissions is 25 tons per year. In 2014, the Folsom Dam Project is expected to emit 31.2 tons.

More at SanLuisObisbo.com >>>