{"id":2671,"date":"2015-02-02T08:42:58","date_gmt":"2015-02-02T16:42:58","guid":{"rendered":"http:\/\/www.americanriverwildlife.com\/?p=2671"},"modified":"2015-02-02T08:42:58","modified_gmt":"2015-02-02T16:42:58","slug":"costs-put-lake-clementine-power-plant-development-plan-on-hold","status":"publish","type":"post","link":"https:\/\/www.americanriverwildlife.com\/?p=2671","title":{"rendered":"Costs Put Lake Clementine Power Plant Development Plan On Hold"},"content":{"rendered":"<p class=\"Bodycopynews\">Plans to develop a hydroelectric project at LakeClementine are on hold, according to a Kruger Energy spokesman.<\/p>\n<p class=\"Bodycopynews\">The Canadian energy company has been working through the Federal Energy Regulatory Commission process but project manager Daniel Parker said that costs associated with interconnecting with Pacific Gas &amp; Electric\u2019s power network in Christian Valley didn\u2019t pencil out.<\/p>\n<p class=\"Bodycopynews\">Because Kruger is the lone applicant on the FERC licensing initiative as Lake Clementine Hydro LLC it would have to shoulder the costs for the infrastructure to connect its hydropower line from the North Fork Dam site on the American River, Parker said.<\/p>\n<p class=\"Bodycopynews\">\u201cWe can\u2019t say we\u2019re stopping the project,\u201d Parker said.<\/p>\n<p class=\"Bodycopynews\">Instead, Kruger has obligations to complete some of its work with the U.S. Army Corps of Engineers and FERC as part of its preliminary permit, he said.<\/p>\n<p class=\"Bodycopynews\">\u201cWe\u2019ve put development of the project on hold,\u201d Parker said.<\/p>\n<p class=\"Bodycopynews\">Parker announced Kruger\u2019s decision Thursday during a meeting of the Auburn Recreation District. The board subsequently approved a letter to be sent to FERC opposing the project, whether it goes ahead in the future or not. The vote was 3-1, with board members Jim Ferris, Gordy Ainsleigh and Jim Gray in favor and Chairman Scott Holbrook against.<\/p>\n<p class=\"Bodycopynews\">Ainsleigh said that despite the project being put on hold by Kruger, the board needed to go ahead with a letter in opposition.<\/p>\n<p class=\"Bodycopynews\">Ainsleigh cited concerns that included potential changes to the 2-mile Clementine Trail from the American River confluence to the lake. Kruger has been considering either the trail or the narrow paved road to the dam as options for access roads during construction. A study plan released in the fall said an access road along the trail could be removed and the site restored or could remain in place to serve another purpose, such as an emergency access or widened recreation trail.<\/p>\n<p class=\"Bodycopynews\">\u201cI\u2019m glad this thing is on hold but I\u2019ve seen all kinds of things resurrected from the dead,\u201d Ainsleigh said, citing various permutations of the long-delayed Auburn dam that have been proposed and then blocked. \u201cI want a few more nails in its coffin.\u201d<\/p>\n<p class=\"Bodycopynews\">Holbrook said his vote against the letter in opposition was more about which letter to send, having been given two choices. But he also stated that there was support in the community for the hydro project, although it didn\u2019t materialize at Thursday\u2019s board meeting.<\/p>\n<p class=\"Bodycopynews\">\u201cI\u2019m far from making a decision one way or another,\u201d Holbrook said.<\/p>\n<p class=\"Bodycopynews\">Holbrook added that a Clementine hydropower project may not be resurrected in his lifetime or those of fellow board members.<\/p>\n<p class=\"Bodycopynews\">\u201cBut in our kids\u2019 lifetime, it probably will,\u201d he said.<\/p>\n<p class=\"Bodycopynews\">More at <a title=\"AuburnJournal.com\" href=\"http:\/\/www.auburnjournal.com\/article\/1\/30\/15\/costs-put-lake-clementine-power-plant-development-plan-hold\" target=\"_blank\">AuburnJournal.com<\/a> &gt;&gt;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plans to develop a hydroelectric project at LakeClementine are on hold, according to a Kruger Energy spokesman. The Canadian energy company has been working through the Federal Energy Regulatory Commission process but project manager Daniel Parker said that costs associated with interconnecting with Pacific Gas &amp; Electric\u2019s power network in Christian Valley didn\u2019t pencil out. &hellip; <a href=\"https:\/\/www.americanriverwildlife.com\/?p=2671\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Costs Put Lake Clementine Power Plant Development Plan On Hold<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,9,6,11],"tags":[],"class_list":["post-2671","post","type-post","status-publish","format-standard","hentry","category-fish","category-safety","category-water","category-wildlife"],"_links":{"self":[{"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=\/wp\/v2\/posts\/2671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2671"}],"version-history":[{"count":1,"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=\/wp\/v2\/posts\/2671\/revisions"}],"predecessor-version":[{"id":2672,"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=\/wp\/v2\/posts\/2671\/revisions\/2672"}],"wp:attachment":[{"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.americanriverwildlife.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}