Bike trail closed near Watt Avenue

A project to repair levee erosion along the American River has closed a portion of the bike and walking path in the parkway near Watt Avenue.

The repairs, overseen by the U.S. Army Corps of engineers, are part of the previously authorized Sacramento River Bank Protection Project, which addresses levee erosion on the Sacramento River and its tributaries.

The latest phase involves placing large rock, called rip-rap, along the waterline of the south bank of the American River at two locations between Watt Avenue and Larchmont Park. A section of public path atop the levee about three-quarters of a mile long will be closed until the expected completion of the work on Nov. 30. Foot and bike traffic are being detoured through the neighborhood south of the levee.

More at SacBee.com >>>